Notable Projects
![ACFS Port of Brisbane – LOGOS ACFS Port of Brisbane – LOGOS](https://kraftur.com.au/wp-content/uploads/2019/09/ACFS-5-800x533.jpg)
ACFS Port of Brisbane – LOGOS
21 September 2019![Ernies Roundabout – McIlwain Civil Ernies Roundabout – McIlwain Civil](https://kraftur.com.au/wp-content/uploads/2019/09/Ernies-3.jpg)
Ernies Roundabout – McIlwain Civil
21 September 2019![Gap Park n Ride – Doval Gap Park n Ride – Doval](https://kraftur.com.au/wp-content/uploads/2019/09/Gap-Park-and-Ride-featured.jpg)
Gap Park n Ride – Doval
21 September 2019![DNV Transport- Port of Brisbane DNV Transport- Port of Brisbane](https://kraftur.com.au/wp-content/uploads/2020/07/DNV-external-finish-Kraftur-Industrial-concrete-contreactor--800x600.jpg)
DNV Transport- Port of Brisbane
24 July 2020![Suez – CIP Constructions Suez – CIP Constructions](https://kraftur.com.au/wp-content/uploads/2020/11/Suez-project-finish-full-aerial-view-800x600.jpg)
Suez – CIP Constructions
11 November 2020![Wemyss – McNab Wemyss – McNab](https://kraftur.com.au/wp-content/uploads/2020/11/Wemyss-2b-800x600.jpg)
Wemyss – McNab
13 July 2021![Team Transport and Logistics- Port of Brisbane Team Transport and Logistics- Port of Brisbane](https://kraftur.com.au/wp-content/uploads/2021/05/Final-touch-for-Team-Transport-Logistics-800x600.jpg)
Team Transport and Logistics- Port of Brisbane
10 May 2021![Warwick Dragway Warwick Dragway](https://kraftur.com.au/wp-content/uploads/2021/10/Warwick-team--800x600.jpg)
Warwick Dragway
7 October 2021![Gallipoli Barracks: Building A New Fire Truck Access Trail Gallipoli Barracks: Building A New Fire Truck Access Trail](https://kraftur.com.au/wp-content/uploads/2022/10/Gallipoli-Barracks-7-800x600.jpg)
Gallipoli Barracks: Building A New Fire Truck Access Trail
6 October 2022“Just wanted to say a big thank you for all your efforts this week on the River City Hospital project. In what has been a very hot and very trying tight site, we have all managed to stay on program and work together.”
Darrin Mitchel – McNab“Just a quick note to express my appreciation of the effort that went in today to achieve our Transfer deck pour. There has been quite a number of people who have commented to me about how there is no ranting or raving on the job just recognition that there are a bunch of blokes who want to get on with it. I think this is why we have been successful. Whilst not easy and not without challenges everyone played their part and the programmed outcome was achieved. Please pass on my appreciation to your workforce. Without their efforts, long days, commitment to safety and the job it would not have happened.”
Jed Overdijk – McNAB“Your team have constantly been on the front foot with either safety or environment. They have never had to be reminded to close-out a concern that has been raised. The quality of the finished product is also to a high standard to which again Shepcon deserve recognition, considering there have only been a small crew at times I believe the quality/ timeframe for the works has been great.”
Brendan Butler – Laingorourke![](https://kraftur.com.au/wp-content/uploads/2019/10/Promise_Safety-R.png)
We work in concrete. We have systems, innovations and standards that deliver a distinct advantage that manifests in a higher standard of workmanship and mitigated risk.
We don’t just lay concrete, we deliver to our clients: A Concrete Advantage.