Project: Team Transport and Logistics
Owner: Port of Brisbane
Builder: McNab
Address:4 Radar St, Lytton QLD 4178
Overview:
The Team Transport and Logistics industrial warehouse project is another addition to Kraftur®’s complement of work at the Port of Brisbane. The project consisted of internal warehouse space, offices, a container hardstand, and concrete manoeuvring pavements.
Scope of works:
- Engineering, fabrication, and supply of a tied joint formwork system integrated with Max Frank Stremaform.
- Supply and installation of internal and external Armour jointing.
- Place and finish fibre reinforced burnished internal warehouse slabs – 2,000 m2.
- Place and finish of a conventional and fibre reinforced (combi) container hardstand using Kraftur®’s Somero S485 laser screed - 6,500 m2.
- Place and finish concrete manoeuvring pavements - 2,000 m2.