Project: Youfoodz Berrinba Distribution Facility Owner: LOGOS Builder: Wiley & Co Pty Ltd Address: 19 Hashim Place, Berrinba Overview: In partnership with LOGOS, Wiley & Co Pty Ltd has brought to life the cutting-edge Youfoodz Berrinba Distribution Facility at 19 Hashim Place. This facility, designed for optimum efficiency, boasts a split layout for Office and … Read More
Author: admin
2022 – Year in Review
Kraftur 8th Year Anniversary Billy Ocean sings “When the going gets tough, the tough get going” The powerful positive energy from Billy Oceans 80’s song is living in the Kraftur Crew in 2022. This year has been a true test of grit, as we have valiantly confronted mounting work demands with limited resources. But showing … Read More
Concrete Aircraft Pavement Construction – Methodologies
Building an airport is probably one of the biggest projects you can undertake. Once they are operational and commercial flights are in full flow, there is little scope for disruptive major repairs, as the infrastructure itself will be used at maximum capacity. This means one thing: whatever you build must be built well from the … Read More
What is a Burnished Concrete Finish?
Burnished concrete offers a beautiful finish to ordinary concrete, creating something appealing and attractive out of something conventional. Put simply, burnishing is a form of polish. It provides a hard wearing, yet attractive, finish by rubbing concrete at high speeds and then occasionally applying a sealer. Chances are you have seen burnished concrete before. It … Read More
Concrete Construction Innovation – What’s Trending
What comes to mind when you think of innovation? 100 dollars says you thought of smart phones, laptops, and software. But concrete? Surely not. Well, think again. The world of concrete construction is a surprisingly innovative place, with breakthrough developments happening all the time. They are changing the industry in many exciting ways and look … Read More
Gallipoli Barracks: Building A New Fire Truck Access Trail
Project: Gallipoli Enoggera Close Training Area Road Works Owner: Department of Defence: Defence Estate and Infrastructure Group Builder: Shamrock Civil Engineering Address: Gallipoli Barracks, Enoggera Overview: Gallipoli Barracks is one of Australia’s largest military bases. The close training area needed a new reinforced concrete fire trail, approximately 220 metres long. Kraftur was commissioned to construct … Read More
Warwick Dragway
Project: Warwick Dragway Builder: Brownlie Concrete Developer: Warwick Dragstrip Address:Morgan Park Warwick QLD Overview: Kraftur® was contacted by the Warwick Dragstrip for our expertise in flat floor concrete work to assist with both construction methodology, laser screeding and onsite finishing assistance for a redevelopment of their Dragstrip involving a concrete strip of about 270 metres long. … Read More
Bandara Street Warehouse Stage 1 & 2 – McNab
Project: Bandara Street Warehouse Stage 1 & 2 Builder: McNab Developer: MADAD Investments Overview: Kraftur® was engaged by McNab for the internals, place, and finish concrete package at the new Bandara Street Richlands Warehouse Stage 1 & 2. Kraftur® worked closely with the McNab project team to achieve the smooth and seamless delivery of both warehouse … Read More
TEYS Port of Brisbane – McNab
Project: Teys Builder: McNab Developer: Port of Brisbane Address: Curlew Street, Port of Brisbane Overview: Industrial facility with 4,000 m2 freezer temperature controlled wearing slabs; 6,000 m2 Internal floors and 8,000 m2 external pavement slabs. The freezer wearing slabs were finished to a flatness rating of FF65 FL40 and the iInternal floors finished to a … Read More
Woolworths Heathwood Temperature Controlled Warehouse – Vaughan Constructions
Project:Woolworths HCFDC, Warehouse Builder: Vaughan Constructions Pty Ltd Developer: LOGOS Address: 30 Seeana Place Heathwood , QLD 4110 Overview: LOGOS won this project by committing to the tight 10-month program and tight budget. Kraftur®’s promise to deliver A Concrete Advantage was achieved by working to a tight timeline and exceeding the client’s quality and service … Read More