Project:Dexus Richlands Warehouse Stage 1
Builder: McNab Developments (Qld) Pty Ltd
Developer: Dexus

Overview:

Industrial facility with over 50,000m2 of warehouse floor area, office space and external hardstand. Final result - FF 80 / FL 78. Kraftur® crew member Travis was also awarded with the safety award.

Scope of works:

  • Install polythene membrane to underside of slabs.
  • Formwork to Loading Dock Leveller set down including casting-in angles/box.
  • Edge form to ground slabs.
  • Formwork to column block outs.
  • Supply and install Armour Joints to FRC slabs.
  • Install isolation joints to panel and block outs.
  • Fix mesh and bar reinforcement.
  • Place and finish Loading Dock slabs.
  • Place and finish Internal Warehouse FRC slabs.
  • Supply and apply CR curing compound.