Project: Teys
Builder: McNab
Developer: Port of Brisbane
Address: Curlew Street, Port of Brisbane
Overview:
Industrial facility with 4,000 m2 freezer temperature controlled wearing slabs; 6,000 m2 Internal floors and 8,000 m2 external pavement slabs. The freezer wearing slabs were finished to a flatness rating of FF65 FL40 and the iInternal floors finished to a flatness rating of FF62 FL34.
Scope of works:
- Setout.
- HD bolt installation.
- Fix bar and mesh reinforcement.
- Edgeform to ground slabs.
- Supply and install armour joints.
- Place and finish footings.
- Place and finish freezer base slabs and freezer wearing slabs.
- Place and finish internal warehouse slabs.
- Place and finish external pavement slabs.
- Supply and apply curing compound.