Project: Gold Coast Airport RPT Apron Upgrade Stage 2B
Builder: SEE Civil
Address: Gold Coast Airport, Bilinga
Overview:
The Gold Coast Airport RPT Apron Upgrade Stage 2B works are a continuation of the Gold Coast aircraft pavement Stage 2 and Stage 2A upgrade works, which were also completed by Kraftur®. The project, like the previous stages, had highly demanding aircraft pavement specification requirements to be met – which Kraftur® again achieved again through close consultation and engagement with the client and the concrete supplier on the project.
Scope of works:
- Supply and installation of custom engineered timber aircraft pavement formwork that conforms to precise specification tolerances for the formwork’s alignment, level, movement limits and dowel positioning.
- Installation of a reinforcing bar.
- Place, compact and finish aircraft pavement concrete according to project specification, using a vibrating truss screed and bridge while monitoring and maintaining optimal environmental conditions for concrete as specified.
- Continuous wet curing of concrete for seven days using hessian mats and soaker hoses
- Saw cutting, joint widening and joint sealing of apron pavement as specified.