Project: Gold Coast Airport – Southern Terminal Expansion.
Builder: Delta Group/Lend Lease
Address: Gold Coast Highway, Bilinga

Overview:

The Southern Terminal Expansion project of the Gold Coast Airport involved the installation of approximately 2000m2 of aircraft pavement, consisting of 300mm thick lean mix sub-base and 465mm flexural pavement. Project specification had onerous requirements for finished apron pavement level, slope and density, which Kraftur® delivered through consultation with the managing contractor and concrete supplier, as well as through innovative solutions planned and delivered on the jobsite.

Scope of works:

  • Place, finish and cure lean mix sub base for apron pavement using Kraftur® total station controlled laser screed.
  • Supply and installation of custom engineered timber aircraft pavement formwork that conformed to tight specification tolerances regarding formwork alignment, level, movement, dowel and tie bar positioning.
  • Installation of reinforcement.
  • Place and finish aircraft pavement concrete according to specification using a vibrating truss screed and bridge, while monitoring and maintaining optimal environmental conditions for concrete as specified.
  • Continuous wet curing of concrete for seven days.
  • Jointing of apron pavement as specified.