Project: Visy Glass Yatala Manufacturing and Recycling Facility
Owner: Visy
Project Partners: Build Run Repair & FDC
Address: 298 Jacobs Well Road, Stapylton QLD 4207

Overview:

At Visy’s new glass manufacturing and recycling facility in Yatala, Kraftur completed an extensive concrete package, including complex concrete works at scale, in partnership with Build Run Repair & FDC.

The facility can produce up to one billion glass bottles a year. Supporting that operation required everything from substantial foundations and suspended structures to high-tolerance storage floors and specialised process infrastructure. Multiple work fronts progressed together under a demanding construction program, with several hundred workers onsite at peak periods.

Key Highlights:

Our scope extended beyond concrete placement and finishing. The completed works included:

  • 259 pile caps, including excavation, holding-down bolts, formwork, reinforcement, concrete pumping and placement.
  • More than 17,000 m² of suspended composite concrete structure.
  • 10,000 m² of complex ground slabs, incorporating machine plinths, trenches and pits.
  • 11,500 m² of 300 mm-thick combi superflat flooring for the automated storage system.
  • Placement and finishing of 180 mm-thick fibre-combi warehouse slabs.
  • Production infrastructure foundations, supporting furnace stacks, service bridges, a conveyor trestle and sprinkler room.
  • A 600 m² cooling tower slab, incorporating 112 plinths and structural steel supports.
  • Specialised liquid-retaining construction, including the double-level API Pit wastewater treatment structure with suspended and cantilevered slabs.
  • Water tank and pump room slabs, alongside a bunded slab with associated footings and plinths.
  • An additional 14,000 m² of concrete works in the facility comprising 2,000 m² of combi storage bunkers, 9,150 m2 of macro-mesh fibre-combi hardstands in the recycling area and 4,600m2 of heavy-duty hardstands around ASRS Warehouse.

Meeting the Technical and Program Requirements

Precision positioning for furnace stacks

Holding-down bolts required positioning within a 10mm tolerance. A purpose-designed support system stabilised the bolt cages throughout concrete placement, achieving final positions less than 5mm from the required location.

Complex liquid-retaining construction

The wastewater treatment structure, known as the API Pit, incorporated 450 m³ of high-strength concrete and approximately 165 tonnes of reinforcement. Its double-level arrangement included liquid-retaining chambers, suspended slabs and cantilevered sections. Delivery required:

  • Mechanical couplers to maintain reinforcement continuity where congestion made conventional bar lapping impractical.
  • Waterstops, specialised formwork ties and controlled concrete temperatures.
  • Inspection and quality control addressing the liquid-retaining requirements of AS 3735.

Working around other trades and commissioning

  • Maintaining the main building program: Critical infrastructure works were completed alongside the main structure without impacting the main building program.
  • Sequencing pavement works: Working with Build Run Repair and Visy’s project team, we planned pours to maintain trade access and enable recycling operations to commence before the overall concrete scope was complete. Additional testing confirmed the required concrete strengths following pours.
  • Supporting early commissioning: Final completion works were undertaken out of hours to enable early access for critical commissioning.

Delivered in Partnership

For the production building and automated storage and retrieval system, Kraftur worked with FDC to deliver suspended slabs, high-tolerance fibre slabs and an extensive in-ground footing package. Close coordination with FDC and other stakeholders helped our crew respond to challenging site conditions and program requirements.

“Their team worked collaboratively with FDC and other stakeholders, adapting effectively to challenging site conditions and program constraints to achieve successful outcomes.”

- Luke Broadhurst, Construction Manager, FDC Construction & Fitout (QLD)

Alongside our work with FDC, Visy engaged Kraftur directly for additional infrastructure and pavement works. Working with Build Run Repair and the wider site team, we coordinated work across shared areas, with regular meetings establishing trade priorities and sequencing. That ongoing communication helped our crew plan resources and adapt pours around access and operational requirements.