Project: Project Candle Stage 2

Builder: Vaughan Constructions (QLD) Pty Ltd

Address: 51 Mapletree Drive, Park Ridge QLD 4125

Overview

Property developer Mapletree engaged Vaughan Constructions to construct Stage 2 of their Project Candle development in Park Ridge QLD.

Stage 2 consists of two warehouse facilities providing over 35,000m2 of industrial floors internally and over 15,000m2 of combined external hardstands. Kraftur complete the concrete works package in December 2024.

Key Highlights

A concise description of the scope of work, and any specific requirements – please use dot points

  • Full survey and setout of all in-situ concrete elements
  • Detailed excavation and placement of concrete foundations
  • Setout and installation of hold down bolts for structural steel columns
  • Formwork setup and installation for slabs, drains, pits and loading docks
  • Formwork to concrete columns and suspended concrete slabs
  • Supply and installation of over 50,000 m2 of reinforcing mesh
  • Supply and installation of over 80 tonnes of reinforcing bar
  • Place over 6,500 m3 and finish over 35,000 m2 of high quality burnished concrete slabs
  • Place over 3,000 m3 and finish over 15,000 m2 of External Hardstand
  • Installation of all bollards for impact protection
  • Extrude all kerbing to concrete pavements
  • All concrete pumping

Challenges and Solutions

Challenge:

Highlight any specific challenges faced during this project, such as tight deadlines, environmental factors, or technical obstacles, and describe how Kraftur overcame them.

Solution:

Due to the scale of the project and tight program to deliver, Kraftur was required to work on both warehouses concurrently. This required a larger crew to service the project, including equipment to place and finish concrete. Kraftur was able to deliver by providing sufficient resources with multiple crews working on different work areas, and using multiple laser screeds and concrete finishing equipment.