Project:Dexus Richlands Warehouse Stage 2
Builder: McNab Developments (Qld) Pty Ltd
Developer: Dexus

Overview:

Kraftur® provided A Concrete Advantage for McNab on Stage 2 of the Freeman Central Warehouse Development in Richland. The overall project result was measured at FF 96 /FL 93.

Scope of works:

  • Formwork to Loading Dock Leveller set down including casting-in angles/box.
  • Edge form to ground slabs and formwork to blockouts.
  • Supply and installation of armour joints to slabs.
  • Install trimmer bars where required.
  • Place and finish Internal burnished warehouse slabs.
  • Supply and application of Chlorinated Rubber curing compound.