Project:Dexus Richlands Warehouse Stage 2
Builder: McNab Developments (Qld) Pty Ltd
Developer: Dexus
Overview:
Kraftur® provided A Concrete Advantage for McNab on Stage 2 of the Freeman Central Warehouse Development in Richland. The overall project result was measured at FF 96 /FL 93.
Scope of works:
- Formwork to Loading Dock Leveller set down including casting-in angles/box.
- Edge form to ground slabs and formwork to blockouts.
- Supply and installation of armour joints to slabs.
- Install trimmer bars where required.
- Place and finish Internal burnished warehouse slabs.
- Supply and application of Chlorinated Rubber curing compound.