Project: Fisher and Paykel Warehouse
Builder: FKG
Address:31 Radar St, Lytton
Overview:
Kraftur® won this contract by committing to the tight program finish date and budget. We offered A Concrete Advantage with our grunt capacity and smart use of technology to finish the project on time and deliver a quality end product. Kraftur® achieved internal floor flatness and levelness result of FF 72.83 FL 60.34, exceeding the specified FF40 FL35 set by the client brief.
Scope of works:
- Detailed excavation.
- HD bolt set out and as-built conformance done with Kraftur® total station.
- Foundations concrete place and finish,
- Dowel and Armour Dowel joint supply and installation.
- Internal warehouse FRC burnished slab place and finish – 20,000 m2.
- External pavement, paths and outbuilding slabs place and finish – 9,000 m2.